Fence Post Concrete Calculator

Enter your post size, hole size and how many posts you're setting to get the number of bags to buy.

About 3 × the post width.
About half the post's height above ground.
For a soil cap; QUIKRETE fills fast-setting to 3–4" below grade.

How the post concrete math works

  1. Area of the ring. The concrete fills the hole around the post: π × (hole diameter ÷ 2)² minus the post's cross-section. A 4×4 is really 3½" × 3½", so it takes up 12¼ square inches.
  2. Filled depth. Hole depth minus any gravel base and minus the gap you leave at the top for soil.
  3. Volume. Ring area × filled depth gives cubic inches; divide by 1,728 for cubic feet.
  4. Bags. Divide by the bag's yield. QUIKRETE lists 0.375 cu ft for a 50 lb bag of Fast-Setting Concrete Mix, and 0.30 to 0.60 cu ft for 40 to 80 lb bags of Concrete Mix. Add your waste margin, multiply by the number of posts, and round up.

Check against the manufacturer: QUIKRETE says two 50 lb bags of fast-setting mix set a 4" round post in a 10" hole 2 feet deep. The ring is π × 5² − π × 2² = 66 sq in; filled to 4" below grade that's 66 × 20 = 1,319 cu in, or 0.76 cu ft. 0.76 ÷ 0.375 = 2.04 bags, which matches their "two bags." (Shopping for one post, the calculator rounds that up to 3 so you're not caught short.)

Bags per post chart

Per post, 50 lb fast-setting mix (0.375 cu ft), filled to 3" below grade, no gravel, no waste margin.

PostHoleDepthConcreteBags per post
4×410.5"24"0.9 cu ft2.4
4×410.5"30"1.16 cu ft3.1
4×412"36"1.93 cu ft5.1
6×616.5"30"2.87 cu ft7.6
6×616.5"36"3.51 cu ft9.3
6×618"42"5.06 cu ft13.5

Setting posts that stay put

Common questions

How many bags of concrete per fence post?

For a 4×4 post in a 10½-inch hole 2 feet deep, filled to 3 inches below grade, it takes about 2.4 bags of 50 lb fast-setting mix. QUIKRETE's own example is two 50 lb bags for a 4-inch round post in a 10-inch hole 2 feet deep. Bigger holes add up fast: volume grows with the square of the hole width.

How big and deep should a fence post hole be?

QUIKRETE says the hole should be about 3 times the width of the post, and the depth about half the post's height above ground (the same thing as one third of the post's total length). Frost depth and local codes can require deeper holes, so check locally.

Fast-setting mix or regular concrete mix?

Fast-setting mix is poured dry into the hole and soaked with water, and sets in 20 to 40 minutes. Regular Concrete Mix is mixed first, takes longer to set, and QUIKRETE suggests waiting 24 hours before putting strain on the post. Both are covered here; pick the bag you plan to buy.

Should I put gravel in the bottom of the hole?

Many builders add a few inches of gravel for drainage. QUIKRETE's Concrete Mix sheet instead starts with 6 inches of dry mix in the bottom. If you use a gravel base, enter its depth and the calculator leaves that part of the hole out.